How does cooperation begin?
With a short technical discussion covering application, material, tolerances, quantity and documentation requirements.
Do you operate under NDA?
Yes. Discretion and compliance are fundamental in defence projects.
What if specifications change during development?
Changes are handled through controlled revision management and re-validation of critical inspection points.
What information should be sent initially?
2D drawings or 3D models, material requirements, tolerances, expected volumes and documentation expectations.
When is additive manufacturing recommended?
For complex geometries, internal channels, rapid iteration or when conventional manufacturing becomes cost- or time-inefficient.
What is the difference between WAAM and DED?
WAAM enables high deposition rates for larger builds, while DED provides refined control over material placement and structure.
What is hybrid manufacturing?
Additive for structural form and complexity, CNC for critical surfaces and tolerances.
Can DED be used for repair or build-up?
In many cases, yes — feasibility is assessed based on material and geometry.
How is consistent quality ensured?
Through controlled processes, documented inspection points and structured quality management systems.
Where can certifications be found?
Under the Certifications section, available for download.
Do you handle prototyping and series production?
Yes. The objective is to transition validated prototypes into reproducible production.
What counts as a critical requirement?
Tolerance, material structure, traceability, surface finish and performance stability.
Where does production take place?
In Hungary, across two facilities (Nagyatád and Pécs).
When will the Pécs facility start operation?
Target launch: end of Q2 2026.
Are there career opportunities?
Yes, current positions are listed under Career.
Are facility visits possible?
Subject to project relevance and compliance conditions.